Hi All

I have been talking to Rudy for the last while and hear is the list of items I have taken on to this weekend

  1. Have the holes filled, where the old light and speaker post were removed. Vito’s crew removed them this week.
  2. Seal up the new speaker post so water cannot enter at the pipe connection.
  3. Paint new ticket both on the spectator side White.
  4. Cut branches or grass that is over guardrail left side.
  5. Tie up wires were required.
  6. Make sure old speakers are put away.
  7. Cleanup wires at tech building by guard rail.
  8. Seal up plugs in top of score boards.
  9. Electrical :
NBDRA Work day this Saturday September 20